Pittwater House sought to redevelop its Collaroy campus to improve current facilities and cater to the projected and anticipated student growth over the coming years. The works were staged to avoid any major inconvenience to the ongoing operation of the school.

Stage 1 – Kiss and Drop Civil Works and Lift/Stair Addition with a maximum 6 weeks construction time on site during Christmas 2021/2022 break
Stage 2 – Walkways and Amphitheatre with a maximum 18 weeks in construction

The project was managed under an Early Contractor Involvement (ECI) process where we were required to drive the design process to achieve a final construction budget, in consultation with the preferred contractor. Construction then occurred during school hours requiring a high level of programme management to ensure minimal disruption to the students and teaching staff.



,